|

“STAYING ON THE GROUND?” The Shocking Cost To Fix The VP’s Jet!

The Federal Government has allocated a cumulative N10.61bn for the overhaul of engines on the Gulfstream G550 aircraft assigned to...

The Federal Government has allocated a cumulative N10.61bn for the overhaul of engines on the Gulfstream G550 aircraft assigned to Vice President Kashim Shettima over a three-year period, an analysis of appropriation bills from 2024 to 2026 has revealed.

The aircraft, registered as 5N-FGW, received the highest single allocation among all engine overhaul projects in the Presidential Air Fleet, accounting for 55 per cent of the N19.27bn total spent on engine maintenance across the fleet under the President Bola Tinubu administration.

Budget documents obtained and analysed by The PUNCH show that the allocation for overhauling the vice president’s aircraft engines jumped from N1.24bn in 2024 to N5.51bn in 2025—a 345 per cent increase—before settling at N3.86bn in 2026.

The 2024 Appropriation Bill listed the project under code ERGP31206170 as “Overhaul of 5N-FGW Engines” with a “NEW” status and an allocation of N1.24bn. By 2025, the project’s status changed to “ONGOING” with the allocation rising to N5.51bn, before declining to N3.86bn in 2026 while maintaining its “ONGOING” status.

The 13-year-old Gulfstream G550, which flies under the call sign “Nigerian Air Force 2” when carrying the vice president, has been plagued by technical faults that have led to cancellations of Shettima’s international trips in the past.

In May 2024, Shettima was forced to abort his trip to the United States for the 2024 US-Africa Business Summit in Dallas, Texas, after the aircraft developed a technical fault mid-flight.

The incident occurred less than a month after President Tinubu was compelled to charter a private jet to Saudi Arabia when the same Gulfstream jet, originally assigned to the vice president, developed an oxygen leak in the Netherlands. Four months later, in October 2024, the vice president again cancelled his trip to the Commonwealth Heads of Government Summit in Samoa after a foreign object hit the aircraft during a stopover at JFK Airport in New York.

Presidency officials, who spoke on condition of anonymity to our correspondent, said the repeated technical failures may have prompted urgent maintenance, which in turn drove the escalating budget allocations.

Aside from the vice president’s aircraft, the FG also allocated funds for overhauling engines on two Falcon 7X jets (registered 5N-FGV and 5N-FGU), which received N1.66bn in 2024, N3.13bn in 2025, and N2.19bn in 2026, totalling N6.98bn over the three years. Additionally, a Gulfstream jet registered 5N-FGS received N1.68bn for engine overhaul in 2024, though no further allocations were made for it in subsequent years.

In total, engine overhaul projects across the Presidential Air Fleet consumed N4.58bn in 2024, N8.65bn in 2025, and N6.05bn in 2026, bringing the three-year aggregate to N19.27bn.

A close study of the allocation patterns revealed that engine maintenance costs peaked in 2025, a year after the Presidency took delivery of the N150bn Airbus A330, which the Spokesman to the President, Bayo Onanuga, argued would “save Nigeria huge maintenance and fuel costs, running into millions of dollars yearly.”

While engine overhaul spending for older aircraft declined by 30 per cent in 2026 compared to 2025, routine aircraft maintenance allocations under line item 22020407 increased by 10 per cent, from N4.12bn in 2025 to N4.54bn in 2026.

Leave a Reply

Your email address will not be published. Required fields are marked *

Sign up for the HB Newsletter

Get stories that matter delivered directly to your inbox

OTHER STORIES

Get the stories that matter most delivered directly to your inbox

© Copyright 2025 – HB Report. All Rights Reserved

HB Logo

Sign up for the HB newsletter

By signing up, you agree to our Privacy Policy and Terms of Use, and agree to receive content that may sometimes include advertisements. You may opt out at any time.